Ore mining and processing mill to the name of M. Lomonosov, Arkhangelsk tube

general contract

Project implementation period: 2005–2009
Customer: Severalmaz, JSC
General design engineering company: Polimetall Engineering, CJSC

In frameworks of this project Kompakt, JSC has fullfilled a complex of works as follows: construction of a stream diversion channel with a length of 8,2 km (diversion of water streams from Svetly creek, Svetlaya, Zolotitsa rivers, Bezymyanny and Zolotitsky creeks from the territory of the mine field), with back filling of weirs and dams;

  • construction of temporary and permanent roads with pit reclamation and embankment filling by the quality ground and sand and gravel mix;
  • back filling of the ore-processing plant site with the quality ground and sand and gravel mix;
  • coating of permanent roads and the oreprocessing plant site with breakstone;
  • construction of the tailings dump facilities: access and patrol roads, slurry lines and recycle water lines, weirs and dams.