Pobeda LSR, JSC brick factory

general contract

Project implementation period: 2008–2009
Customer: Pobeda LSR, JSC
General design engineering company: Proyektny Institut No. 2, JSC

The project has been implemented on the site having total area of 34 hectares, with area of the production complex itself — 7,2 hectares. Investment to the project made up about 10 billion rubles. Built from the greenfield, the factory is provided with the complete infrastructure: all utility networks have been constructed as required by the production process, gas water and electric power supply have been connected. The company is supplied with the equipment produced by world leading manufacturers — German Händle and Hans Lingl.